Since 1996, ImageGrafix has been the leading value-added-distributor, technical support center, and service provider of engineering software packages and solutions addressing Energy (Oil & Gas and Power), Building & Infrastructure and Product Design & Manufacturing (CAD/CAM/CAE) solutions throughout India.
We are the specialist for all your Oracle Primavera needs, in India.
Call us at 1-800-102-4437 or fill out our contact form to discuss your Primavera Installation Service or Training requirements whether deploying on-premise or hosted perpetual license. ImageGrafix’s team of Primavera Consultants are here to support you.
India’s capital territory Delhi is a massive metropolitan area in the country’s north. In Old Delhi, a neighborhood dating to the 1600s, stands the imposing Mughal-era Red Fort, a symbol of India, and the sprawling Jama Masjid mosque, whose courtyard accommodates 25,000 people. Nearby is Chandni Chowk, a vibrant bazaar filled with food carts, sweets shops and spice stalls.
New Delhi is the capital of India and an administrative district of NCT Delhi. New Delhi is also the seat of all three branches of the government of India, hosting the Rashtrapati Bhavan, Parliament House, and the Supreme Court of India. Delhi itself is often considered as a hub for international trade. New Delhi was designed by British architects Sir Edwin Lutyens and Sir Herbert Baker.
Although colloquially Delhi and New Delhi are used interchangeably to refer to the National Capital Territory of Delhi (NCT), these are two distinct entities, with New Delhi forming a small part of the city of Delhi. The National Capital Region is a much larger entity comprising the entire NCT along with adjoining districts in neighboring states which includes but is not limited to Ghaziabad, Noida, and Faridabad.
The straight and diagonal pattern of the broad tree-lined avenues in New Delhi, with extensive green spaces and wide vistas, contrasts sharply with the crowded, narrow, and winding streets characteristic of Old Delhi. The main east-west axis of New Delhi is Central Vista Park, which is flanked by government buildings, museums, and research centers in a parklike setting.
ImageGrafix Software Solutions Pvt Ltd.
B-213, 2nd Floor, Ansal Chamber-1, Bhikaji Cama Place, New Delhi 110066 011-41017381
TEL: +91-1141017381
Email: delhi@imagegrafix.in
Website: www.imagegrafix.in